Become a partnerThe Perce-Neige climbs from Val Claret to the Grande Motte glacier through 3,490 m of tunnel. Summer 2026: 20 June – 31 August — one of five end dates published for this site.

The Grande Motte funicular, known as the Perce-Neige, climbs from Val Claret towards the Grande Motte glacier at Tignes. It is almost entirely underground: 3,490 m of tunnel, except for a short middle section where two parallel bores let the trains pass each other. Secondary sources present it as the longest funicular in France.
Do not confuse it with the Grande Motte cable car, which takes over above it and has its own page. The funicular starts at Val Claret; the cable car does not.
Summer 2026: running from 20 June to 31 August, daily, on two timetables — 06:45 to 16:05 early in the season, 09:30 to 17:05 afterwards. No source publishes the date on which one gives way to the other.
Summer running from 20 June to 31 August 2026 per the operator. This site carries five different end-of-season dates depending on the source and on what is being described (skiing, lifts, glacier): check on the day rather than trusting a seasonal page.
Hosting visitors of Grande Motte Funicular ? Appear here.
Become a partnerShare hours and specialties with visitors of Grande Motte Funicular.
Become a partnerGîte, B&B, campsite, rental in Tignes.
Become a partnerBeen there? Share your photos — we'll add them to this page with credit. Tag #loisirs73 or email photos@loisirs73.fr
3,490 m, almost entirely in tunnel. Secondary sources present it as the longest funicular in France; no operator source states this.
No. The funicular runs from Val Claret up to the glacier; the Grande Motte cable car takes over above it. They are two machines in series, each with its own page.
From 20 June to 31 August 2026, daily. Be careful: four other end-of-season dates circulate for the Grande Motte site, between 15 July and 6 September. Check before going up.
Two windows are published, 06:45–16:05 early season and 09:30–17:05 afterwards, but no source says when the switch happens.
14 April 1993. Tunnelling ran from 13 December 1989 to 1 October 1991, after geological studies in 1987.
Multi-source verification at publication. Information may change — confirm with the official operator before travelling.